The copper firebox of the Zuckersusi needs a new front wall (towards the long boiler). Since such spare parts
The boiler has arrived at Bilfinger Berger BIS Industrial Services (Frankfurt). There, the boiler bottom (picture below left) and
The lower part of the long boiler must be replaced. Fabrication and installation of the replacement part will be
Originally, only half of the smoke chamber was to be replaced. Now we have decided to replace the entire
In 2009, the railroad expert and the workshop manager visit the Pila plant to inspect the progress of work
Work on 98 727 will begin in the summer of 2006 with the complete disassembly of the locomotive into