23 042
One of the purposes of using the 23 during the Easter trips was to check the work carried out on the Krauss-Helmholtz steering gear. After the weekend, it was established that this work was another successful step towards commissioning the locomotive.
Nevertheless, a setback must also be reported: During the final service, the locomotive crew discovered damage to the crosshead bolt on the driver’s side. After a diagnosis a week later in the workshop, it became clear that the crosshead bolt and the bushing were damaged. To ensure that the 23 042 would be available for the Railway World Days, it was decided to overhaul the crosshead bolt so that it could continue to be used temporarily and to produce a new gunmetal bushing for the driving rod on the driver’s side. The stoker side of the locomotive was also checked to rule out the same damage there.