Reconstruction of locomotive shed: Erection of the steel supports (July 2021)

Before the foundation could be concreted, the steel supports for the new partition wall had to be erected. Together with the crossbars to be installed later, these form the steel framework, which will then be bricked up. First, the position of the posts had to be measured. Then core drillings were made in the old foundation, the post anchors aligned and grouted with swelling mortar.

After it had hardened, the steel posts were erected with the help of the two-way excavator and fixed to the anchors at the bottom. At the top, they were fixed to the existing roof truss.

Bahnwelt Newsletter

Registrieren Sie sich jetzt für unseren Bahnwelt Newsletter, um stets über kommende Veranstaltungen und aktuelle Aktivitäten informiert zu sein!

25 00 V002

Nach dem Erfolg der Erstauflage für das aktuelle Jahr ist auch für 2025 ein Kalender mit zwölf einzigartigen und handverlesenen Aufnahmen historischer Eisenbahnfahrzeuge in authentischer Kulisse des Eisenbahnmuseums entstanden.

Der Kalender ist ab sofort online oder im Museumsshop erhältlich!

Gender notice

For better reading, the masculine form is used for personal names and personal nouns on this website. Corresponding terms apply in principle to all genders for the purpose of equal treatment. The abbreviated form of language is for editorial reasons only and does not imply any valuation.

Newsletter Anmeldung bestätigen

Sie erhalten in Kürze eine E-Mail an die von Ihnen angegebene E-Mail-Adresse. Bitte bestätigen Sie Ihre Newsletteranmeldung über den darin enthaltenen Link.